Photos of the New Facility
 
First Page Previous Next Last Page All

Chemical warehouse driveway at Macon Hub Plant. Six bulk tanks are in use and can be used to fill shuttles on the customer's semi trailer. All this happens inside the building's containment!
The loadout towers are pictured above. The lane on the left is for straight product, and the lane on the right is for blended product. A light system mounted on the wall allows the control room to communicate with the driver and load efficiently and quickly.
Farmers Elevator is shown in the background as rebar and concrete are poured in the foreground for the new facility.
The 14 foot deep tunnel is being formed that will eventually house the receiving conveyor. Both railcars and trucks will unload here and the product will be carried to the top of the plant and distributed to the appropriate time. A 100 ton railcar can be emptied in 6-9 minutes.
Lots of room for Crop Protection Products can be stored in the temperature controlled warehouse.
Copyright DTN. All rights reserved. Disclaimer.